OUR RECENT PROJECTS

Bright Future Energy Group is focused on providing high quality service and customer satisfaction. We will do everything we can to meet your personal and business expectations by providing high quality products at competitive prices. 

Droitwich High School

We were invited to look at Droitwich Spa High School as part of their decarbonisation scheme to reduce demand on energy, save on energy bills and reduce their carbon footprint. A 76KWP system was installed over three of the flat roofs, all using a south facing ballast system to maximise total energy generation and they can expect to generate more than 100’000kWh worth of free electricity every year!

European Space Agency

Bright Future LED are delighted to have been involved in the construction of the European Space Agency’s new Conference Centre.

BF LED were involved at a very early stage creating a design that met the Clients Spec, but also their Budget.

Our design for the Exhibition and Circulation areas included 600mm/900mm/1200mm suspended circular panels, complimented by Suspended and Recessed Linear units.

Over 150 downlighters, wall washers and track spots were also included in the design created for a stunning conference hall.

To complete the professional look, our External Bulkheads and Downlighters were powder coated to match the cladding……..nice touch.

Student Accommodation

BF LED were engaged to provide a Value Engineered Design for this 183 bedroom 7 storey Student Accommodation project.

Full “in house” design was completed for Bedrooms, Corridors, Stairwells, Private Dining Rooms, Study Rooms, Gym, and Social areas.

A mixture of Surface Linear, Recessed linear, Track & Spot, Pendants, “Anglepoise style fittings”, Bulkheads (c/w microwave sensing), Downlighters and full EML completed the design.

……..Students taking residence here are definitely in for treat.

Project Omega

Bright Future are happy to share a new project being supplied in Oxfordshire! Project Omega in Witney is out of the ground!

Leading Learners Project

4 schools supplied in Greater Manchester for Leading Learners.

Schools Surveyed, 8th June
Orders placed, 8th July
Installation Completed, 26th August.

Payback Period inc Installation – 2.5 years
Carbon Reduction – 36.91 Tonnes
Energy saving per annum – £59,000 (based on pre price cap increase)

D&B Birmingham

30000 sq ft office space D&B in Birmingham

– Fully controlled LED installation.
– Dali fittings controlled with occupancy & daylight harvesting sensors.
– Self Test Dali Addressable Emergemcy.

Please contact us for information on our products & services 🌱

Loading...